Muzinq / De Popzaal
New construction of the pop hall in Almere. Work was carried out by Meetatelier (part of IGG Bouweconomie).
Projectinformation:
Functions: | Leisure/Culture |
Architect: | Alsop Londen |
Type of contract: | NEN calculation |
Assignment: | Carrying out the NEN 2580 measurements, including providing insight into the total floor area of a building with challenging architecture and ditto shapes. |