New construction of the satellite control towers at the fifth runway at Schiphol.
HES
The four greenhouses are an addition within the original budget. In this way, the HES has received the auditorium “for free”. Despite the unconventional shape, the building has an extremely support structure that arises from the parking layer. The exterior, with its friendly shape, contrasts with the harshness of the environment and thus introduces the informal character and casual atmosphere of the interior.
WTC Schiphol
Newly built office building World Trade Center with a floor space of 65.000 m² and 5500 parking spaces. The development of the WTC was carried out in two phases. Delivery phase 1: 1996, phase 2: 2003.